Supply and installation of parts for major iron ore project
The scope of work included supply and installation of process water pumps at a large-scale iron or mining operation in WA.
| Flow: | 10,057m³/h |
| Head: | 79m |
| Power: | 2200kW |
| Rpm: | 740 |
Key milestones included:
Over 30% reduction in spare parts was achieved post installation.

| Flow: | 3,500m³/h |
| Head: | 180m |
| Power: | 2200kW |
| Rpm: | 1480 |
Key milestones included:
The installation enabled water from the dewatering plant to be pumped back to a concentrate process water dam 30km away.