Supply and installation of parts for major iron ore project

Supply and installation of parts for major iron ore project

The scope of work included supply and installation of process water pumps at a large-scale iron or mining operation in WA.

Flow:10,057m³/h
Head:79m
Power:2200kW
Rpm:740
Key milestones included:

Over 30% reduction in spare parts was achieved post installation.

Flow:3,500m³/h
Head:180m
Power:2200kW
Rpm:1480
Key milestones included:

The installation enabled water from the dewatering plant to be pumped back to a concentrate process water dam 30km away.